Containers at the port terminal
Home / Glossary / CY – Container Yard

CY – Container Yard. The container yard.

The Container Yard (CY) is the open area of a port or inland terminal where full and empty containers are received, stored, stacked and delivered. In transport contracts the abbreviation CY also marks the point where the carrier takes or delivers the container already closed, typical of FCL shipments.

Glossary · Sea freightUpdated 27 November 20264 min read

What a container yard is

The yard of a container terminal is organised in blocks of stacked containers, divided by status (full, empty), destination, type and weight. Equipment such as rubber-tyred gantry cranes (RTG), straddle carriers and reach stackers works in the yard. In contract language, “CY” does not just mean the physical place, but a condition of delivery: the carrier receives or delivers the container at its yard.

The life of a container in the CY

  1. Export. The loaded and sealed container arrives at the terminal by lorry or train, by the cut-off set for the ship. It passes the gate, is inspected and stored in the yard.
  2. Loading. When the ship is due to depart, the container is picked up and taken to the ship-to-shore crane, which loads it.
  3. Import. On arrival, the opposite: discharge, storage in the yard and delivery to the consignee after checks and customs formalities.
  4. Empties. Empty containers are collected and returned at areas or depots agreed with the shipping line.

CY/CY, CY/CFS and the other abbreviations

Sea bookings show a pair of terms that says how the goods are delivered and collected:

  • CY/CY: the customer delivers the full container to the yard at origin and collects it full at the yard at destination. It is the typical formula for FCL.
  • CFS/CY or CY/CFS: one of the two ends involves the CFS, with loose goods that the carrier loads or unloads.
  • Door: if the carrier collects or delivers at the customer's premises, this is called the “door” formula; see the entry on carrier and merchant haulage.

Free days, storage and costs

The yard is a limited resource, so time spent there matters. At departure, the full container cannot arrive too early (there is an earliest receiving date) or too late (cut-off). On arrival, the container can stay for a certain number of free days; beyond that, storage charges apply. The conditions depend on the terminal and the shipping line, and must be read in the contract of carriage. For storage penalties, see the entry on demurrage. Handling in the yard is linked to the THC, the terminal handling charges.

A practical example

A company from the Brescia area loads a 40-foot container with machine tools. The forwarder arranges the pick-up of the empty, loading takes place at the plant and the sealed container goes to the CY of the port of loading. On the day of departure, the yard sequences it for the ship. On arrival, the consignee collects the container from the CY at destination, after customs clearance. For exports from Lombardy, inland intermodal terminals are also often used, where the container is checked before continuing by rail.

Common mistakes

  • Arriving at the CY after the cut-off and missing the ship.
  • Not communicating the VGM in time, which is needed for acceptance at the yard.
  • Not checking the place and time for returning the empty.

Sources

  1. ICC – Incoterms® 2020 rules
FAQ

Quick answers.

What does CY mean?

It stands for Container Yard, the terminal area where the carrier receives and delivers containers. In bookings it means that the container is taken or delivered already closed, without the carrier loading or unloading its contents.

What does CY/CY mean?

It means that the customer delivers the full container to the yard at origin and the consignee collects it, again full, at the yard at destination. It is the typical formula for port-to-port FCL shipments.

What is the difference between CY and CFS?

The CY receives containers that are already closed; the CFS receives loose goods to load them into a shared container (LCL), or takes them out on arrival. The first concerns FCL, the second LCL.

What is the container yard cut-off?

It is the deadline by which the full container and its data, such as the VGM, must be delivered to the yard in order to be loaded on a given ship. After the cut-off the container may end up on a later sailing.

Your next project

Your next shipment starts here.

Map of Dalè's headquarters in Via Bruno Buozzi 14, Brescia Via Bruno Buozzi, 14 · BresciaDirections ↗ © OpenStreetMap

Request a quote