What it is and how it is built
The portainer is a gantry crane that runs on rails parallel to the quay. It has a cantilever arm (boom) that extends over the ship and can be raised to let ships manoeuvre past. A trolley moves along the boom, and from it hangs the spreader, the frame that attaches to the four corners of the container with locking devices (twistlocks). The cranes are also called STS, ship-to-shore, because they work between the ship and the land.
How it works in a terminal
- The ship berths and the portainers position themselves opposite the holds and the blocks of containers on deck.
- For discharge, the spreader attaches to the container, lifts it and sets it down on quayside equipment (tractor with trailer or automated vehicle).
- The container reaches the yard, the container yard, where yard equipment stacks it.
- For loading, the path is the reverse, following the stowage plan prepared for the ship.
Several cranes work at the same time on the same ship. The number of moves per hour of a crane depends on the terminal, the weather and the stowage plan.
Size and ships
Portainers are classified according to the size of the ships they can serve, in particular how many rows of containers their boom reaches across and the height to which they can lift them. Very large ships need cranes with a long and high boom. This is one of the reasons why not all ports can accommodate the largest mother vessels, alongside suitable water depth and quays. Portainers are part of the equipment of a container terminal.
Cranes and the Lo-Lo method
Loading by crane is the feature of the Lo-Lo (lift on, lift off) system, unlike Ro-Ro, where vehicles drive onto the ship on their own wheels. Portainers are the main tool of Lo-Lo for containers. Small ships or general cargo ships sometimes have their own cranes on board, used in ports with little equipment.
A practical example
A container of machinery that left Brescia by train arrives at the port terminal. It is unloaded from the train with yard equipment and set down in a block. On the day of loading, quayside equipment takes it under the portainer, which picks it up with the spreader and places it in the slot assigned by the stowage plan. The shipper does not see the crane, but feels its effects: delivery times to the terminal and the cut-off depend on the planning of these moves.
Good to know
- Strong wind, rain and poor visibility can stop the cranes and delay ships and deliveries.
- A container with a wrongly declared weight, or with data that differ from the VGM, can be stopped before it is lifted.
- Containers damaged during lifting must be reported to the terminal immediately, with photos and a report.
Sources
A shipment to organise?
Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.
Related Dalè services
Related glossary terms

