Containers at the port terminal
Home / Glossary / VGM – Verified Gross Mass

VGM – Verified Gross Mass. No verified weight, no sailing.

The VGM (Verified Gross Mass) is the verified gross mass of a loaded container: goods, packaging, securing materials and the tare of the container. Since 1 July 2016 the SOLAS convention has required it before a container can be loaded on a ship. The responsibility for obtaining and sending it lies with the shipper named in the transport document.

Glossary · Sea freightUpdated 27 November 20264 min read

What the VGM is

The rule is about safety: a container heavier than declared can compromise the stability of the ship, overload cranes and cause accidents in port or at sea. Under the amendment to the SOLAS convention (chapter VI, regulation 2, paragraphs 4-6), in force since 1 July 2016, a loaded container cannot be put on board unless it comes with its verified gross mass. The IMO guidelines for implementation are in circular MSC.1/Circ.1475.

The VGM is not the weight of the goods, nor the weight shown on the invoice: it includes everything inside the container, plus the tare shown on the door.

The two methods

  • Method 1 - weighing: the loaded and closed container is weighed on a certified, calibrated weighbridge, for example at a terminal or a weighing facility.
  • Method 2 - calculation: you add up the weights of all the packages, pallets, timber and securing materials, and add the tare of the container. The method must be approved by the competent authority of the country where the container is loaded; for Italy it is best to check the national instructions in force with the forwarder, because calculation is not unrestricted.

The two routes are not interchangeable at will: anyone without approval for method 2 must weigh. For goods in packages whose weight has already been declared by the manufacturer, such as packed pallets, calculation is not enough unless it is authorised.

Who sends it, to whom and when

The person responsible is the shipper in the transport document. The figure is sent electronically or in writing to the shipping line and the terminal, signed or identified by an authorised person. The submission deadlines (the so-called cut-off) are set by the carrier and the terminal, and vary by port and line: the figure must arrive in time for the loading plan. A container without a VGM is not loaded: it stays on shore, with storage costs and the risk of being rolled over to the next sailing.

A practical example

A company in Brescia fills a 40 foot container with machines packed in crates for a customer in Brazil. Before pick-up the company, which is authorised to use calculation, adds up the weights of the crates and timber and adds the tare shown on the door. If it did not have the authorisation, the container would have to be weighed at the port, with extra time and cost. Dalè sends the VGM to the carrier within the cut-off, together with the export declaration.

Common mistakes

  • Sending the net weight of the goods instead of the gross mass.
  • Forgetting the tare or using a tare different from the one marked on the container.
  • Treating another weighing as equivalent, such as the weight of the lorry weighed at the toll gate.
  • Sending the figure after the cut-off, or in a format the terminal does not accept.
  • Not keeping a record of the method and the date: the carrier or the authorities may ask for proof.

The declared weight must also respect the maximum container weight and the limits for road circulation. For an overview of containers see the container guide; for the path of the shipment, FCL containers.

Sources

  1. IMO - Verification of the gross mass of containers
  2. IMO - Circular MSC.1/Circ.1475

A shipment to organise?

Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.

Related Dalè services

Related glossary terms

FAQ

Quick answers.

Who is responsible for the VGM?

The shipper named in the transport document. It is not the carrier or the terminal: if the shipment is handled by a forwarder, the forwarder sends the figure but the responsibility stays with whoever loaded.

Does the VGM also apply to refrigerated containers or those with dangerous goods?

Yes, it applies to every loaded container to be put on a ship subject to SOLAS, of any type. It does not apply to non-containerised cargo such as break bulk, nor to containers on chassis or semi-trailers loaded on Ro-Ro ships on short international voyages.

Can you weigh the lorry instead of the container?

Only if the combination is weighed on a certified weighbridge and the weight of the container is obtained by subtracting the tare of the tractor and the chassis. A documented procedure must be used, accepted by the carrier and the terminal.

What happens if the VGM is wrong?

The terminal may carry out spot checks and refuse loading, and the carrier may charge re-verification costs. Administrative consequences vary from country to country; the most concrete risk is missing the sailing.

Your next project

Your next shipment starts here.

Map of Dalè's headquarters in Via Bruno Buozzi 14, Brescia Via Bruno Buozzi, 14 · BresciaDirections ↗ © OpenStreetMap

Request a quote