What they are
The bill of lading is not written by the carrier from scratch: it is compiled from the shipper's information. The document that carries this information is called shipping instructions, often abbreviated SI. It can be a form from the carrier, a file sent by email or an online entry. For forwarders working in the customer's name, the SI are the step between the booking and the transport document.
What they contain
- Shipper, consignee and notify party: name, address and contacts; see shipper, consignee and notify.
- Ports of loading and discharge, vessel and voyage as in the booking.
- Description of the goods, marks and package numbers, number and type of packages.
- Gross weights and volumes, consistent with the VGM.
- Container and seal numbers.
- Freight: prepaid or collect, see prepaid and collect.
- Type of bill of lading required: original, sea waybill or telex release, and the number of originals.
- For dangerous goods, the UN number, class and declaration details.
- Any customs codes and references to the letter of credit.
Deadlines
The carrier sets a documentary deadline (SI cut-off), normally before the vessel's departure and distinct from the container's physical cut-off at the terminal. After it passes, the SI may be refused or accepted with additional costs, and the container risks not sailing; see roll over.
The instructions are also needed for security declarations. For goods bound for Europe, the ICS2 system requires the data before arrival. For goods bound for the United States, the importer, or whoever represents it, must file the Importer Security Filing at least 24 hours before the vessel is loaded at the foreign port, according to the instructions of US customs, CBP. If the description of the goods in the SI is generic, the declarations may have to be corrected.
Common mistakes
- Names or addresses different from those in the letter of credit or the invoice: the bank may refuse the documents.
- Vague description ("various goods", "parts"): it hinders the security declaration and may lead to inspections.
- Weights that do not match the packing list and VGM.
- Freight shown wrongly: if it is prepaid but the bill of lading shows collect (or the other way round), a dispute with the consignee arises.
- Wrong container or seal number: every correction after issuance requires a new bill of lading.
- Not sending while waiting for the final data: better to send a complete version and correct it in time.
Practical example
A taps and fittings exporter in Brescia sends the SI for a 20-foot container bound for the Middle East. The consignee is the importing company, the notify party is its local forwarder and the freight is prepaid because the delivery term provides for it. After sending, the carrier sends the draft bill of lading to be checked. Dalè prepares the SI together with the export customs documents: for a sea shipment the data must match the invoice, packing list and declaration.
Sources
A shipment to organise?
Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.
Related Dalè services
Related glossary terms

