Warehouse with pallets ready for shipment
Home / Glossary / Cut-off

Cut-off. The last deadline before loading.

The cut-off is the final deadline by which goods or documents must be delivered to the terminal or the carrier to be loaded on a given ship or aircraft. After the cut-off the shipment is no longer accepted for that departure and slips to the next one. There are different cut-offs for goods, documents and data.

Glossary · International trade and IncotermsUpdated 27 November 20264 min read

What it is

Ships and aircraft leave according to a precise plan. Before departure the terminal has to receive the containers or packages, record the data, carry out checks and plan the load. The cut-off is the moment after which nothing more is accepted for that departure. The carrier states it in the booking confirmation, and it always comes before the estimated departure (ETD).

Types of cut-off

In sea transport there are three main ones, and each has its own date:

  • Cargo (or terminal) cut-off: the last moment to deliver the full container to the port terminal. It also applies to the consolidator's warehouse in sea groupage, which has its own, earlier date.
  • Documentary cut-off: the deadline for sending the shipping instructions, that is, the data the carrier uses to prepare the bill of lading. After this date changes may cost money or may no longer be accepted.
  • VGM cut-off: the deadline for communicating the container's verified gross mass, required by the SOLAS Convention (see VGM). Without the VGM the container is not loaded.

In air transport the cut-off concerns delivery of the goods to the warehouse of the carrier or the handler, which has to complete acceptance, security checks and load preparation before the flight; delivery of documents and electronic data is added to this. Anyone shipping goods that require special checks, such as dangerous goods, must meet earlier deadlines.

There is a cut-off in road services too: the time by which a collection must be confirmed to be included in the day's round.

What happens if you miss it

  • The goods are not loaded and move to the next departure, with the resulting loss of time.
  • Extra costs may arise: booking penalties, container storage, collection and redelivery.
  • If there is a letter of credit with a latest shipment date, the delay may make the documents non-compliant.

Practical example

A company from Brescia has to ship a container to Asia leaving from the port of Genoa. The booking shows the documentary cut-off, the VGM cut-off and the cargo cut-off, each with date and time. The container is loaded at the company, taken to the terminal and delivered before the deadline; the VGM and the shipping instructions are sent within the time limits. If the truck were late beyond the cut-off, the container would stay on the ground until the next ship.

Dalè gives the customer the carrier's deadlines already in the booking confirmation and follows them through to loading; the exact dates change from service to service and must always be read on the booking.

Common mistakes

  • Thinking that the cut-off coincides with the ETD.
  • Forgetting the documentary cut-off and the VGM, which usually come before the cargo one.
  • Not leaving a margin for pick-up at the company, traffic and checks.
  • Not allowing for closures on public holidays in the country of departure.

Sources

  1. IMO – International Maritime Organization
  2. IATA – Cargo

A shipment to organise?

Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.

Related Dalè services

Related glossary terms

FAQ

Quick answers.

What happens if I miss the cut-off?

The goods are not accepted for that departure and move to the next one, if there is space. There may be storage and rescheduling costs, and for payments by letter of credit the delay can cause problems.

Is the cut-off the same for goods and documents?

No. In sea transport there are separate dates for delivery of the container, for the shipping instructions and for the VGM. All of them must be checked on the booking.

What is the VGM and how does it relate to the cut-off?

It is the container's verified gross mass, required by the SOLAS Convention. It must be communicated by a deadline, called the VGM cut-off, otherwise the container cannot be loaded on the ship.

Does the cut-off also apply to aircraft?

Yes. The carrier or the handler states by when the goods must be delivered to the warehouse for acceptance, checks and loading on the flight. Special goods usually have earlier deadlines.

Your next project

Your next shipment starts here.

Map of Dalè's headquarters in Via Bruno Buozzi 14, Brescia Via Bruno Buozzi, 14 · BresciaDirections ↗ © OpenStreetMap

Request a quote