What it is
Freight is the payment for transport. With the wording prepaid the carrier has already collected from the shipper, or from its forwarder, before handing over the bill of lading. With collect the freight is due from a different party, normally the consignee, who must pay to obtain release of the goods. It is not a formal detail: the formula chosen determines whom the carrier can turn to for payment.
The link with the delivery term
The choice usually follows the Incoterms rule:
- in the terms where the seller arranges and pays for the main carriage, such as CFR, CIF, CPT, CIP and the D terms, the freight is normally prepaid;
- in the terms where the main carriage is the buyer’s responsibility, such as EXW, FCA, FOB, the freight is normally collect.
The bill of lading does not change the sales contract: it is worth checking that the indication is consistent, to avoid the seller paying for transport that was not its responsibility or the buyer refusing to pay freight already included in the invoice.
Freight and other charges
Besides sea freight there are origin and destination charges, for example THC, BAF and other surcharges. They do not always follow the same rule as the freight: the freight may be prepaid and the destination charges be for the consignee, or the other way round. For this reason always ask for a clear breakdown of what is included in the wording and what is left out.
Risks of collect freight
- If the consignee does not pay, the carrier can withhold the goods at destination and let storage and other costs build up.
- The shipper can still be called on to answer for the freight, because it is the party that contracted the transport.
- Timing: the goods are not released until the freight is settled, even with the container already at the port.
How to avoid problems
- Check that shipping instructions, booking and bill of lading show the same wording; see shipping instructions.
- With a letter of credit, check what the credit requires about freight: the wording "freight prepaid" on the bill of lading is often required.
- Tell the consignee in advance what it will have to pay at destination.
- For collect freight, consider advance payment or a written agreement with the consignee.
Practical example
A company in Brescia sells machinery "CIF" to a foreign customer and ships a container by sea. The freight is the seller’s responsibility, so the bill of lading carries "freight prepaid" and the buyer collects without further transport charges. If instead the sale were "FOB", the freight would be collect and the consignee would have to pay it before release. Dalè, for sea shipments, checks that the wording on the bill of lading is consistent with the delivery term on the invoice.
Sources
A shipment to organise?
Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.
Related Dalè services
Related glossary terms

