What it is
Goods arriving from a third country, by sea, air, road or rail, cannot be used or sold straight away. First they must be presented to customs and then placed under a procedure. Between arrival and the procedure there is a waiting period, which the Union Customs Code (Regulation (EU) No 952/2013, Article 144 and following) calls temporary storage. In practice it means goods unloaded in a terminal, in a port or airport warehouse, waiting for someone to submit the import declaration.
How it works
- Information before arrival. The security information (ENS) reaches customs before loading or arrival, depending on the mode of transport.
- Presentation. On arrival the goods are presented to customs, usually with a temporary storage summary declaration or with an entry in the warehousekeeper's records.
- Storage. The goods stay in an authorised place. The warehousekeeper is responsible for them, keeps the records and cannot allow any processing or transformation.
- Destination. Within the time limit, the goods are given a procedure: free circulation, customs warehousing, transit, re-export.
The 90-day limit
Goods can stay in temporary storage for 90 days at most. If no destination is assigned in that time, customs can order their sale, destruction or other measures of its own motion, and the costs fall on the owner. The time limit is short on purpose: temporary storage is not a warehouse, but a technical stop. To hold goods under suspension for a long time you need a procedure, such as customs warehousing or the free zone.
Where it takes place
Only in places authorised by the Customs and Monopolies Agency (ADM): port and airport areas, inland freight hubs (interporti), temporary storage warehouses of authorised operators. The operator must have suitable premises, accounting that traces every package and a guarantee. This explains why goods arriving at a large port are found in specialised terminals, and why moving them elsewhere requires transit or another authorisation.
A practical example
A container of machinery arrives in Genoa. The terminal takes it in under temporary storage. If the importer already has the documents and a declaration ready, the goods can be cleared in a few steps. If instead a certificate or an invoice is missing, the container stays put: every day terminal costs, demurrage and detention pile up, and the 90-day clock runs. That is why it pays to prepare the documents before arrival. Dalè's customs department in Brescia can set up the declaration while the ship is still at sea.
How it differs from other institutions
- Customs warehousing: a real procedure, with authorisation and no general time limit.
- VAT warehouse: an Italian tax institution, which has nothing to do with the customs stop.
- Logistics warehouse: holds goods already cleared, with no customs restrictions.
Common mistakes
- Treating temporary storage as a storage solution.
- Letting the 90 days pass for lack of documents.
- Handling or opening packages before the declaration, without authorisation.
- Underestimating the daily terminal and container costs.
For a well-prepared import, see the page on customs clearance in Brescia.
Sources
- Regulation (EU) No 952/2013 – Union Customs Code
- Agenzia delle Dogane e dei Monopoli (Italian Customs Agency)
A shipment to organise?
Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.
Related Dalè services
Related glossary terms

