Containers at the port terminal
Home / Glossary / FIO clauses (free in and out)

FIO clauses (free in and out). Who loads and discharges.

In charter contracts the FIO (free in and out) clause provides that the charterer, not the shipowner, bears the cost and organisation of loading and discharging the cargo. The variants FIOS (stowed) and FIOST (stowed and trimmed) extend the rule to other operations.

Glossary · Sea freightUpdated 27 November 20263 min read

What the abbreviations mean

FIO clauses describe who bears the operations on the cargo at the port of departure and at the port of arrival. In the expression “free in and out”, “free” means that the shipowner is free of them: costs and risks of these operations fall on the charterer.

  • FIO (free in and out): the charterer pays for loading (in) and discharging (out). The shipowner provides the ship, the master and the crew, but does not pay for the quayside labour.
  • FIOS (free in and out, stowed): the charterer also pays for the stowage, that is, the placing of the goods in the holds.
  • FIOT (trimmed): includes trimming of bulk cargo, that is, levelling the cargo in the hold.
  • FIOST (stowed and trimmed, or lashed): the charterer also bears stowage and lashing or trimming, according to the usage of the contract.

The final letter can vary depending on ports and custom: this is why the text of the contract counts, not just the abbreviation.

Where they are used

FIO clauses concern voyage and time charters of whole ships, especially for bulk cargo, general cargo and project cargo. They do not apply to normal container liner service, where operations are governed by the carrier's terms and by terminal charges, such as THC. In chartering they are compared instead with the opposite formula, the “liner terms” (or gross terms) charter, in which the shipowner also bears loading and discharging, and the freight rate is higher.

Practical consequences

  • Costs. With FIO, the cost of labour and shore equipment passes to the charterer, who often passes it on to the seller or buyer of the goods, depending on the Incoterms rule used.
  • Liability for damage. If loading is done by the charterer or its appointees, damage caused by wrong loading and stowage is harder to attribute to the shipowner. This is set by the contract and the applicable law.
  • Time. Loading and discharging take place within the agreed times (laytime). If these are exceeded, ship waiting penalties are paid, often called demurrage.

A practical example

A construction company imports steel beams with a ship chartered on a voyage basis for a single cargo. The contract says “FIOS”: the company chooses the quayside gang, pays for loading and stowage at the port of departure and organises discharge at destination. The shipowner is responsible for navigation, but not for operations ashore. If the cargo is very unusual, the rules for heavy-lift cargo are also assessed.

Common mistakes

  • Assuming that FIO includes stowage and securing.
  • Not coordinating waiting times with those of the sales contract.
  • Confusing the meaning of the abbreviation in chartering with that of terminal terms.

For shipments of containers, general cargo or part loads, Dalè works with liner sea services, where these clauses do not apply.

Sources

  1. UNCITRAL – Rotterdam Convention on the carriage of goods by sea

A shipment to organise?

Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.

Related Dalè services

Related glossary terms

FAQ

Quick answers.

What does FIO mean in chartering?

It means free in and out: loading and discharging of the cargo are for the charterer's account, not the shipowner's. The shipowner provides the ship and the crew, but does not pay for quayside operations.

What is the difference between FIO, FIOS and FIOST?

FIO covers loading and discharging. FIOS adds stowage, that is, placing the goods in the hold. FIOST also adds lashing or trimming. The contract always states the exact content.

Do FIO clauses apply to liner containers?

Generally not. In container liner services, loading and discharging follow the carrier's terms and the terminal tariffs. FIO clauses are typical of the charter of whole ships.

What are liner or gross terms?

They are the opposite formula to FIO: the shipowner also bears loading and discharging operations and the cost is included in the freight. As a result, the freight is generally higher.

Your next project

Your next shipment starts here.

Map of Dalè's headquarters in Via Bruno Buozzi 14, Brescia Via Bruno Buozzi, 14 · BresciaDirections ↗ © OpenStreetMap

Request a quote