Truck on the road
Home / Glossary / Reservation on delivery (riserva)

Reservation on delivery (riserva). Write it before you sign.

A reservation (riserva) is the written objection the consignee notes on the delivery document when the goods arrive with missing or broken packages, or in a condition different from the one declared. It preserves your right to compensation from the carrier. In international road transport it is governed by Article 30 of the CMR Convention.

Glossary · Road freightUpdated 27 November 20264 min read

What it is and what it is for

When the driver delivers, the consignee signs the transport document or the consignment note. If that signature is "clean", it says the goods arrived as described. The reservation is the sentence that deliberately makes it "dirty": "two wet packages", "one pallet missing", "box no. 7 open". It is not a formality. It is written, dated proof that the damage was noticed at the time of delivery and not invented later.

Without a reservation, the carrier can claim that everything was in order. The consignee can still prove otherwise, but starts uphill. With a reservation, the problem is captured at the right moment and the later claim has a solid basis.

What the CMR says (Article 30)

For road transport between two different countries, the CMR Convention normally applies. Article 30 distinguishes three cases:

  • Apparent damage or loss: the reservation must be made at the time of delivery, noted on the document the driver has signed.
  • Non-apparent damage (discovered when the package is opened): written reservation to the carrier within seven days of delivery, Sundays and public holidays excluded.
  • Delay: no compensation without a written reservation to the carrier within 21 days from the time the goods were placed at the consignee's disposal.

The day of delivery is not counted. If the goods were checked jointly, that is by the consignee and the carrier together, objections can be raised only for non-apparent damage and always within seven days of the check. A late reservation does not necessarily cancel your right, but it shifts the burden of proof against you.

How to write it well

An effective reservation is specific, not generic. "Subject to inspection" or "with reservation of checking" is worth little, because it does not say what is wrong. It is better to describe:

  • how many packages or pallets are missing, wet, dented or reopened;
  • which signs are visible: cut tape, broken strapping, a tilted pallet;
  • any broken seals, or seals different from those indicated.

Add the date, a legible signature and, if possible, a copy for yourself. Then photograph everything before moving the packages: shots with the document in the foreground and the damaged packages still on the vehicle or on the dock are the best evidence.

A practical example

A foundry in Valtrompia sends eight pallets of valves to a customer in Germany. On arrival the warehouse worker notices two pallets with torn film and a crushed box. Before signing, he writes on the document: "2 pallets torn film, 1 box damaged, contents to be checked", then dates and signs it. The next day, opening the packages, he finds a deformed component on a pallet that looked intact: he sends a written notice to the carrier within the seven days. The picture is complete: apparent damage reserved at once, hidden damage reported within the deadline.

Common mistakes

  • Signing in a hurry to free the driver and discovering the damage later, with no note at all.
  • Writing only "with reservation", without saying about what.
  • Objecting verbally, or by phone, with no written trace sent to the carrier.
  • Exceeding seven days (or 21 for delay) for non-apparent damage.

Who supports you

If the goods left with a freight forwarder, the reservation must be reported to them too: they can collect the documents, notify whoever carried the goods and set up the claim. Dalè follows these cases for the road shipments it organises, from the delivery document through to the claim with the carrier and, where there is one, with the insurer. Remember: the reservation protects your right to compensation, but the amount then depends on the carrier's limits of liability and on the cargo insurance.

Sources

  1. CMR Convention, text deposited with the United Nations

A shipment to organise?

Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.

Related Dalè services

Related glossary terms

FAQ

Quick answers.

What is a reservation on the delivery note or the CMR?

It is a note written by the consignee on the delivery document, before signing, to report missing or broken packages or goods in a condition different from the one declared. It preserves the right to compensation from the carrier.

How many days do I have to object to damage that is not visible?

In international road transport under the CMR, seven days from delivery, Sundays and public holidays excluded, with a written reservation to the carrier. For delay the deadline is 21 days from the goods being placed at your disposal.

If I sign without a reservation, do I lose the right to compensation?

Not automatically, but the goods are presumed to have arrived in the condition stated on the document. You can prove otherwise, with photos, reports and correspondence, but it is harder.

Can I refuse damaged goods?

You can, but it is usually better to receive them with a detailed reservation and ask the sender and the carrier for instructions, so the goods are not left in storage with no decision.

Your next project

Your next shipment starts here.

Map of Dalè's headquarters in Via Bruno Buozzi 14, Brescia Via Bruno Buozzi, 14 · BresciaDirections ↗ © OpenStreetMap

Request a quote