What break bulk is
The expression means "breaking up the load": the goods do not travel in a single box but are lifted and stowed piece by piece, or in lots on pallets. It is the oldest form of sea transport, now reduced by containers but still indispensable for certain cargo. It differs from dry bulk, such as grain or coal, where the goods are loose and uniform, and from Ro-Ro, where the cargo drives on on its own wheels.
When it is used
- Project cargo: turbines, reactors, transformers, blades, large steel structures, plant to be assembled on site.
- Long or heavy goods: steel coils, pipes, beams, stone blocks, which are easier to handle outside a container.
- Ports without container lines, where a conventional ship is the only choice.
- Out-of-gauge loads that not even a flat rack can hold.
How it works
The shipment starts with a contract with the shipowner or with an agent who collects the cargo. You discuss the stowage plan: where the piece is loaded, with what lifting equipment, at which securing points. The goods arrive at the quay or directly alongside the ship, are lifted by the ship's cranes or by port cranes and placed in the hold or on deck. Securing materials (chains, timber, lashings) are used and the loading plan is drawn up. At the destination the operation is repeated in reverse.
The transport document is the bill of lading, often in "conventional" form, which describes the goods as packages, with any remarks by the master on the condition of the pieces. The port of loading and the port of discharge must have suitable equipment and quays with sufficient load capacity.
A practical example
A manufacturer in the Brescia area has to deliver a machine tool weighing many tonnes to a customer in Egypt. The dimensions do not allow a container, so the piece is taken on an abnormal load vehicle to a port, where a conventional ship loads it with its own cranes. First the authorisations for abnormal load transport are obtained, times and loading point are agreed with the terminal, and the export customs declaration is prepared. The piece is packed and protected with care, because conventional cargo is subject to more lifting.
What needs more attention
- Packaging: strong crates, rust protection, clear marking of the lifting points and the centre of gravity.
- Damage: more handling means more risk. A suitable cargo policy and an inspection before loading are prudence, not luxury.
- Waiting at the quay: if the ship is late, the cargo may stay in port longer than planned; conditions and responsibilities are agreed in good time.
- Hold and deck: cargo above deck (deck cargo) is more exposed and changes the clauses of the policy.
For exceptional loads, Dalè works through the dimensions, weight and route to the port with you, and handles the customs side in its own department in Brescia. An overview of maritime services is on the sea freight page.
Sources
A shipment to organise?
Tell us what you are shipping and where to: we reply with the route, the documents required and a quote.
Related Dalè services
Related glossary terms